Road Paving

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Weed Ave

The city-wide road assessment is complete and identified the top 200 roads to be paved over the next several years. The assessment was conducted by IMS, an independent and non-governmental pavement assessment company, with the goal of determining an objective measure to establish a priority list for paving operations. 

The goal of the Administration is to pave the 200 roads by the end of 2025. In 2022, the City paved over 75 roads, doubling the number of roads from the previous year. At the conclusion of the 2023 paving season, the administration had paved over 130 roads. 

The current paving operations is focused on the Top 100 roads and once completed, the City will move to pave the roads listed as 101 - 200. The roads are listed in alphabetical order and not in the order of which they will be paved. 

The City recently reformed its utility paving coordination by focusing on resurfacing roads impacted by utility projects and striving to pave the impacted roads "curb-to-curb" within 90 days of the completed utility project. Some roads not included on priority lists may be paved during this period if they are impacted by a utility project.

PAVING LIST - TOP 100
ROAD NAME:
AKBAR RD
AMHERST CT
ARDEN LN
AVON LN
AYRES DR
BERKELEY ST
BETTS AVE
BIG OAK LN
BLUE RIDGE DR
BRANTWOOD LN
BREEZY HILL RD
BRUSHWOOD RD
BURDICK ST
BURWOOD AVE
CEDAR CIR
CHATFIELD ST
CLOVER HILL DR
COURTLAND CIR
COVE VIEW DR
CRICKET LN
CROFTS LN
CROSS COUNTRY TRL
DARTLEY ST
DENICOLA PL
DUNN CT
EASTHILL RD
EDGEWOOD AVE
EIGHTH ST
ELY PL
EVERGREEN CT
FAIRLAND ST
FLINT ROCK RD E
FROST POND RD
GLEASON AVE
GOLDEN FARM RD
GREENWICH AVE (E)
HAPPY HILL RD
HAZELWOOD LN
HIGH ROCK RD
HILLVIEW LN
HOLLY COVE CIR
HOME CT (CDS)
HYDE ST
INDIAN ROCK RD
IVY ST
JACKSON ST
KIRKHAM PL
KLONDIKE AVE
KNOLLWOOD AVE
LAWN AVE
LIGHTHOUSE WAY
LIPTON PL
LONGVIEW AVE
LYNAM CT
MAC GREGOR DR
MARINERS LN
MATHEWS ST
MEADOWPARK AVE E
MELROSE PL
MICHAEL RD
MOHAWK TRL
NOBILE ST
OCEAN DR W
OLD BARN RD N
OLD BARN RD W
PALMER ST
PAUL RD
PINE ST
POND VIEW LN
REED PL
REVONAH CIR S
RIDGE BROOK DR
RIDGE BROOK LN
RIVER RIDGE CT
RIVERBANK DR
ROCK RIMMON LN
ROSE PARK AVE
ROSE ST
SADDLE HILL LN
SADDLE HILL RD
SAGAMORE RD
SANFORD LN
SHAGBARK RD
SHELTER ROCK RD
SILVER ST
SQUARE ACRE DR
ST MARYS ST
STILLVIEW RD
THORNWOOD RD
TYLER DR
WALNUT RIDGE LN
WALTER LN
WARDWELL ST
WHITE BIRCH LN
WILDER RD
WIND MILL CIR
WINDING BROOK LN
WINESAP RD
WOODCLIFF ST
YALE CT
PAVING LIST - TOP 101 to 200
ROAD NAME:
ACOSTA ST
ALEXANDRA DR
AMHERST PL
APPLE VALLEY RD
ARCHER LN
BARMORE DR
BAXTER AVE (N)
BEAL ST
BEL AIRE DR
BIRCHWOOD RD
BLACK ROCK RD
BOULDER BROOK DR
BRIDGE ST
BRIGHTON PL
BRINCKERHOFF AVE
BRODWOOD DR
CAMBRIDGE RD
CAMORE ST
CANFIELD DR
CANTWELL AVE
CHESTERFIELD RD
CIDER MILL RD
CORN CAKE LN
COWING TER
CRAIG CT
CRANE RD N
CRESTWOOD DR
DALY ST
DIAMONDCREST LN
DOGWOOD CT
DUBOIS ST
ELJAYS LN
ERICKSON DR
ETHAN ALLEN LN
FARA DR
FAWN DR
FLINT ROCK RD
FOURTH ST
FRANKEL PL
GILFORD ST
GOLF VIEW CIR
GURLEY RD
HARTFORD AVE
HAVILAND DR
HELEN PL
IDLEWOOD PL
INGALL ST
IRON GATE RD
JUDY LN
KIJEK ST
KNOBLOCH LN
LANARK RD
LANCER LN
LINDSEY AVE
LYNAM RD
MAITLAND RD
MARIAN ST
MC CLEAN AVE
MEADOWPARK AVE N
MEADOWPARK AVE W
MITCHELL ST
MOUNTAIN TRL
MOUNTAIN WOOD RD
NATHAN HALE DR
NICHOLS AVE
NOB HILL LN
NORTHWOOD LN
OLD BARN RD S
OLD COLONY RD
OLGA DR
OWEN ST
PARAGON LN
PARK ST
PARKER AVE
PEPPER RIDGE PL
PHAIBAN LN
PINE HILL TER
RED BIRD RD
RELAY PL
RIDGE TREE LN
RISING ROCK RD
RIVER PL
ROCKRIDGE LN
SHADOW RIDGE RD
SILVER HILL LN
SOUND AVE
SOUNDVIEW AVE
SUMMIT RIDGE RD
TAYLOR ST
THUNDER HILL DR
TOWER AVE
TRAILING ROCK LN
TREMONT AVE
URBAN ST
VALLEY VIEW DR
VAN BUSKIRK AVE
VAN RENSSELAER AVE
WARCHOL LN
WARSHAW PL
WARWICK LN

 

*This is the initial paving list for the 2024-2025 season and the City intends to pave at-least 50 roads this season. More roads will be added to this list

Paving 2024-2025

1

Silver St

2

Burwood Ave

3

Beal St

4

Melrose Pl

5

Betts Ave

6

Warshaw Pl

7

Jackson St

8

Taylor St

9

Rose Park Ave

10

Nobile St

11

Depinedo Ave

12

Acosta St

13

Relay Pl

14

Pine St

15

Oak Hil St

16

Woodcliff St

17

Hubbard Ct

18

Ivy St

19

Vuono Dr

20

Golf View Circle

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

2023 Road Paving Schedule

Road Name Scope Date Method
Robin Hood Rd Entire road Apr-23 Mill & Pave
Friar Tuck Ln Entire road Apr-23 Mill & Pave
Little John Ln Entire road Apr-23 Mill & Pave
Nottingham Dr Entire road Apr-23 Mill & Pave
Echo Hill Dr Entire road Apr-23 Reclaim & Pave
West View Ln Entire road May-23 Reclaim & Pave
Progress Dr Entire road May-23 Reclaim & Pave
Houston Terrace Entire road May-23 Mill & Pave
Avery St Entire road May-23 Mill & Pave
Dora St Entire road May-23 Mill & Pave
Dale St Entire road May-23 Mill & Pave
St. Benedict Circle Entire road May-23 Mill & Pave
William St Entire road May-23 Mill & Pave
Cove Rd Willowbrook to St. Benedict Circle May-23 Mill & Pave
Lee St Entire road Jun-23 Mill & Pave
Warren St Entire road Jun-23 Mill & Pave
Woodrow St. Entire road Jun-23 Mill & Pave
Fieldstone Ln Entire road Jun-23 Mill & Pave
Fieldstone Rd Entire road Jun-23 Mill & Pave
Fieldstone Circle Entire road Jun-23 Mill & Pave
Fieldstone Terrace Entire road Jun-23 Mill & Pave
Ralsey Rd Entire road Jun-23 Mill & Pave
Ralsey Rd S. Entire road Jun-23 Mill & Pave
Downs Ave Entire road Jun-23 Mill & Pave
Ralph St Entire road Jun-23 Mill & Pave
Whittaker St Entire road Jun-23 Mill & Pave
Stamford Ave Entire road Jun-23 Mill & Pave
Viaduct Rd Entire road Jun-23 Mill & Pave
Larkin St Entire road Jun-23 Mill & Pave
Poplar St Entire road Jun-23 Mill & Pave
Research Dr Entire road Jun-23 Mill & Pave
Cove Rd St. Benedict Circle to Elm Street Jul-23 Mill & Pave
W. Haviland Ln Entire road Aug-23 Reclaim & Pave
Bennington Ct Entire road Aug-23 Reclaim & Pave
Windward Lane Entire road Sep-23 Reclaim & Pave
Pond View Ln Entire road Sep-23 Reclaim & Pave
Golden Farm Rd Entire road Sep-23 Reclaim & Pave
Ridge Brook Dr Entire road Sep-23 Reclaim & Pave
Ridge Brook Lane Entire road Sep-23 Reclaim & Pave
Breezy Hill Rd Entire road Sep-23 Reclaim & Pave
Happy Hill Rd Entire road Sep-23 Reclaim & Pave
Mohawk Trail Entire road Oct-23 Reclaim & Pave
Shagbark Rd Entire road Oct-23 Reclaim & Pave
Tyler Dr Entire road Oct-23 Reclaim & Pave
Saddle Hill Rd Entire road Nov-23 Reclaim & Pave
Saddle Hill Ln Entire road Nov-23 Reclaim & Pave
Winesap Rd Entire road Nov-23 Reclaim & Pave
Crofts Ln Entire road Nov-23 Reclaim & Pave

2024 Road Paving Schedule

Road Name Scope Date Method
Nicholes Ave + extension Entire Road May-24 Reclaim & Pave
Hillview Lane Entire Road May-24 Reclaim & Pave
Yale Ct Entire Road May-24 Mill & Pave
Mercedes Lane Entire Road May-24 Mill & Pave
Knollwood Ave Entire Road May-24 Mill & Pave
Walnut Ridge Lane Entire Road May-24 Mill & Pave
Longview Ave Entire Road May-24 Mill & Pave
Clover Hill Dr Entire Road May-24 Mill & Pave
Evergreen Ct Entire Road May-24 Mill & Pave
Stillview Rd Entire Road May-24 Reclaim & Pave
Stanton Dr Entire Road May-24 Mill & Pave
River Ridge Ct Entire Road Jun-24 Mill & Pave
Three Lakes Dr Entire Road Jun-24 Mill & Pave
Sound Ave Entire Road - Utility Coordination Jul-24 Mill & Pave
Mitchell St Entire Road - Utility Coordination Jul-24 Mill & Pave
Mariners Ln Entire Road - Utility Coordination Jul-24 Mill & Pave
Gurley Rd Entire Road - Utility Coordination Jul-24 Mill & Pave
Chesterfield Rd Entire Road - Utility Coordination Jul-24 Mill & Pave
Seventh St Entire Road - Utility Coordination Jul-24 Mill & Pave
Weil St Entire Road - Utility Coordination Jul-24 Mill & Pave
Sachem Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Uncas Rd Entire Road - Utility Coordination Jul-24 Mill & Pave
Wascussee La Entire Road - Utility Coordination Jul-24 Mill & Pave
Willowbrook Ave Cove to Hale - Utility Coordination Jul-24 Mill & Pave
Hale St Entire Road - Utility Coordination Jul-24 Mill & Pave
Willowbrook Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Ferro Dr Hale to 26 Ferro Dr - Utility Coordination Jul-24 Mill & Pave
Kirkham Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Union St Entire Road - Utility Coordination Jul-24 Mill & Pave
Elm Tree Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Third St Bedford to Morgan - Utility Coordination Jul-24 Mill & Pave
Morgan St 3rd to 5th - Utility Coordination Jul-24 Mill & Pave
Fourth St Bedford to Revonah - Utility Coordination Jul-24 Mill & Pave
Urban St Entire Road - Utility Coordination Jul-24 Mill & Pave
Revonah Ave Revonah Circle to Chester - Utility Coord. Jul-24 Mill & Pave
Bridge St Washington to Summer - Utility Coord. Jul-24 Mill & Pave
Woodmere Rd Hubbard to Bridge - Utility Coord. Jul-24 Mill & Pave
Pellom Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Pell Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Lipton Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Atlantic Ave Henry to Lipton - Utility Coordination Jul-24 Mill & Pave
Eigth St Entire Road - Utility Coordination Aug-24 Mill & Pave
Waterford Lane Entire Road - Utility Coordination Aug-24 Mill & Pave
Wascussee Lane East Entire Road - Utility Coordination Aug-24 Mill & Pave
Paragon Ln Entire Road - Utility Coordination Aug-24 Mill & Pave
Red Bird Rd Entire Road - Utility Coordination Aug-24 Mill & Pave

Pepper Ridge Rd

2025 Road Paving Schedule

Road Name Scope Date Method
Wardwell St Entire Road 25-Apr Mill & Pave / Reclaim
Park St Entire Road 25-Apr Mill & Pave
Cummings Ave Entire Road 25-Apr Mill & Pave
Frederick St Entire Road 25-Apr Mill & Pave
Soundview Ave Entire Road 25-Apr Mill & Pave
Soundview Ct Entire Road 25-Apr Mill & Pave
Old Colony Rd Entire Road – Utility Coordination 25-Apr Mill & Pave
Bennette St Entire Road – Utility Coordination 25-Apr Mill & Pave
Van Buskirk Ave Entire Road 25-Apr Reclaim & Pave