Zoning Permits

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Zoning Standalone Permit

You would need to complete a Zoning Permit Application (standalone) if you have confirmed that your project is not associated with a building permit.

If you have a Building Permit and want to add something that is not part of the building code such as:

  • A shed under 200 square feet.
  • A fence and/or wall under 7 feet.
  • Excavations.

You can add these items to the current Zoning review that is already incorporated within your Building Permit. This will ensure that all your project needs are combined under one permit. All changes for these items will be under the Zoning review tab. The building permit work description will only contain items covered under the state building code.

If you have any questions, please contact the following prior to completing the permit application:

  • Zoning Department (203) 977-4711; ZoningEnforcement@stamfordct.gov
  • Building Department (203) 977-4164; BuildingDept@stamfordct.gov

ATTENTION: YOU MUST HAVE THE OFFICIAL ADDRESS TO START AN APPLICATION

Walk-In Hours

Our Planning & Zoning Department provides guidance on land use, permitting, and compliance with local zoning laws. Residents and developers are welcome to visit during designated walk-in hours for assistance with applications, regulations, and general inquiries.

Hours: 8:30 am to 10:30 am

Dates: Every Wednesday

Location: Stamford Government Center, 7th Floor Lobby (Fix)

To help us serve you more efficiently, please review our zoning regulations.

Zoning Regulations

Zoning Quick Facts

Zoning Enforcement FAQS

For Zoning Permits issued as part of a Building Permit, work can only begin after the Building Department has issued a permit and all fees have been paid. For a standalone Zoning Permit, work can only begin after a Zoning Officer has issued a Zoning Permit and the fee has been paid.

A Zoning Permit issued as part of a Building Permit is valid as long as the Building Permit. A standalone Zoning Permit is valid for twelve (12) months and may be extended by an additional twelve (12) months.

  • As part of the Building Permit, a Zoning Permit is required for:
    • Construction of a new residential or new commercial building;
    • Construction of new additions to an existing commercial/residential building;
    • Changes to the interior of residential and commercial buildings impacting or changing floor plans (not required for mechanical permits, such as plumbing, electrical or HVAC);
    • Expansion of height, footprint, floor area, volumetric content or use of an existing structure;
    • Temporary or permanent accessory structures (including but not limited to): signs, walls, fences, pools, certain playground equipment, garage structures, tents, mechanical equipment (e.g., air conditioning compressor units or generators), decks/patios constructed 8 inches or more above grade;
    • Increases or changes to the uses of a property;
    • Excavation and removal of more than 100 cubic yards of excavated materials or the disturbance of more than 10,000 sf of material.

Fees for Zoning Permits as part of the Building Permit are collected by the Building Department and the same payment options apply. 

The current Zoning Permit fee schedule can be found here.

A standalone Zoning Permit is required for:
  • A shed under 200 square feet 
  • Construction of a fence and/or wall less than 7feet high;
  • Changing the use of a building or land with no change to the structure itself.

Stamford’s Zoning Regulations and Zoning Map are available on the Zoning Board page.