Road Paving

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

The city-wide road assessment is complete and identified the top 200 roads to be paved over the next several years. The assessment was conducted by IMS, an independent and non-governmental pavement assessment company, with the goal of determining an objective measure to establish a priority list for paving operations. 

The current paving operations is focused on the Top 100 roads and once completed, the City will move to pave the roads listed as 101 - 200. The roads are listed in alphabetical order and not in the order of which they will be paved. 

The City recently reformed its utility paving coordination by focusing on resurfacing roads impacted by utility projects and striving to pave the impacted roads "curb-to-curb" within 90 days of the completed utility project. Some roads not included on priority lists may be paved during this period if they are impacted by a utility project.

2026 Road Paving List

The below roads are slated for repaving during the 2026 paving season. 

The Paving Schedule for 2026 is subject to change based on available resources and funding. Roads not on this list may be paved as well based on observed field conditions. Not all of the below roads may be paved in the 2026 season. 

Road Name
Survey
Limits
Scope
Status

Northern Roads

Walter Lane Top 100 entire road Reclaim and pave Complete
Den Rd old list north and south sides of Merritt reclaim and pave Complete
Thunder Hill Dr Top 101-200 entire road reclaim and pave Complete
Den Rd captured Flint Rock to Hardesty reclaim and pave Complete
Flint Rock Rd captured entire road reclaim and pave Complete
Iron Gate Rd Top 101-200 entire road reclaim and pave Complete
Flint Rock Rd E Top 100 entire road reclaim and pave Complete
Bangall Rd captured entire road reclaim and pave In Progress
Valley View Rd Top 101-200 entire road reclaim and pave Complete
Northwood Ln Top 101-200 entire road reclaim and pave Planned
Rockridge Ln Top 101-200 entire road reclaim and pave Planned
Lynam Rd captured entire road reclaim and pave Planned
Nob Hill Ln Top 101-200 entire road reclaim and pave Planned
Lynam Ct Top 100 entire road reclaim and pave Planned
Dogwood Ct Top 101-200 entire road reclaim and pave Planned
Honey Hill Rd captured entire road reclaim and pave Planned
Dogwood Ln captured entire road reclaim and pave Planned
Briarwood Ln captured entire road reclaim and pave Planned
Big Oak Ln Top 100 entire road reclaim and pave Planned
Diamondcrest Ln Top 101-200 entire road reclaim and pave Planned
Redmont Rd captured entire road reclaim and pave Planned
Blue Ridge Dr Top 100 entire road reclaim and pave Planned
Roxbury and Westover captured Intersection reclaim and pave Complete
 Constance Ln  captured  entire road reclaim and pave Complete

 

Road Name
Survey
Limits
Scope
Status

Shadow Ridge Area

Shadow Ridge Rd Top 101-200 entire road reclaim and pave In Progress
Sun Dance Rd captured entire road reclaim and pave In Progress
Snow Crystal Ln captured entire road reclaim and pave In Progress
Bradley Pl captured entire road reclaim and pave In Progress
Corn Cake Ln Top 101-200 entire road reclaim and pave In Progress
Wild Horse Rd captured entire road reclaim and pave In Progress
Sun Dance Circle captured entire road reclaim and pave In Progress
Wilder Rd Top 100 entire road reclaim and pave In Progress
Lancaster Pl captured entire road reclaim and pave In Progress
 Cedar Circle  Top 101-200 entire road reclaim and pave In Progress

 

Road Name
Survey
Limits
Scope
Status

Springdale

RIVER PL Top 101-200 entire road Mill and pave In Progress
HYDE ST Top 100 entire road Mill and pave In Progress
GILFORD ST Top 101-200 entire road Mill and pave In Progress
PALMER ST Top 100 entire road Mill and pave In Progress
TOWER AV Top 101-200 entire road Mill and pave In Progress
BIRCHWOOD RD Top 101-200 entire road Mill and pave In Progress
KLONDIKE AV Top 100 entire road Mill and pave Planned
MARIAN STREET Top 101-200 entire road Mill and pave Planned
HARTFORD AV Top 101-200 entire road Mill and pave Planned
AVON CT Top 100 entire road Mill and pave Planned
BARNSTABLE LN captured entire road Mill and pave Planned
CASTLE CT captured entire road Mill and pave Planned
COLUMBUS PL captured entire road Mill and pave Planned
Woodbury Ave captured Tower to Lawton Mill and pave Planned

 

Road Name
Survey
Limits
Scope
Status

Glenbrook/East Side

FAIRLAND ST Entire road Mill and pave Planned
HORNEZ STREET Entire road Mill and pave Planned
FRANCIS AV Entire road Mill and pave Planned
BURDICK ST Entire road Mill and pave Planned
COWING PL Entire road Mill and pave Planned
COWING TERRACE Entire road Mill and pave Planned
COWING CT Entire road Mill and pave Planned
PARKER AV Entire road Mill and pave Planned
ROSE ST Entire road Mill and pave Planned
FRANKEL PL Entire road Mill and pave Planned
ELY PL Entire road Mill and pave Planned
TREMONT AV Entire road Mill and pave Planned
LAWN AV Entire road Mill and pave Planned
HELEN PL Entire road Mill and pave Planned
JUDY LA Entire road Reclaim and pave Planned
LAWN AV Entire road Mill and pave Planned
MAITLAND RD Entire road Reclaim and pave Planned
COVE VIEW DR Entire road Mill and pave Planned
DALY ST Entire road Mill and pave Planned
NORTH STATE ST NO 1 Entire road Mill and pave Planned
COURTLAND CIR Entire road Mill and pave Planned
DAYCROFT RD NO 1 Entire road Mill and pave Planned
HOME COURT Entire road Mill and pave Planned
MATHEWS ST Entire road Mill and pave Planned
CAMBRIDGE RD Entire road Mill and pave Planned

 

Top 200 Road List

The city-wide road assessment is complete and identified the top 200 roads to be paved over the next several years. The assessment was conducted by IMS, an independent and non-governmental pavement assessment company, with the goal of determining an objective measure to establish a priority list for paving operations. 

The current paving operations is focused on the Top 100 roads and once completed, the City will move to pave the roads listed as 101 - 200. The roads are listed in alphabetical order and not in the order of which they will be paved. 

PAVING LIST - TOP 100  Status  PAVING LIST - TOP 101 to 200 Status 
ROAD NAME:   ROAD NAME:  
AKBAR RD  Paved  ACOSTA ST  Paved 
AMHERST CT   ALEXANDRA DR  
ARDEN LN   AMHERST PL  
AVON LN   APPLE VALLEY RD  
AYRES DR   ARCHER LN  
BERKELEY ST  Paved  BARMORE DR  
BETTS AVE  Paved  BAXTER AVE (N)  Paved 
BIG OAK LN   BEAL ST  Paved 
BLUE RIDGE DR   BEL AIRE DR  
BRANTWOOD LN  Paved  BIRCHWOOD RD  
BREEZY HILL RD  Paved  BLACK ROCK RD  
BRUSHWOOD RD  Paved  BOULDER BROOK DR  
BURDICK ST   BRIDGE ST  Paved 
BURWOOD AVE  Paved  BRIGHTON PL   
CEDAR CIR   BRINCKERHOFF AVE  
CHATFIELD ST  Paved  BRODWOOD DR   
CLOVER HILL DR  Paved  CAMBRIDGE RD   
COURTLAND CIR   CAMORE ST   
COVE VIEW DR   CANFIELD DR   
CRICKET LN   CANTWELL AVE   
CROFTS LN  Paved  CHESTERFIELD RD  Paved  
CROSS COUNTRY TRL   CIDER MILL RD   
DARTLEY ST   CORN CAKE LN   
DENICOLA PL   COWING TER  
DUNN CT   CRAIG CT   
EASTHILL RD   CRANE RD N   
EDGEWOOD AVE  Paved  CRESTWOOD DR   
EIGHTH ST  Paved  DALY ST   
ELY PL   DIAMONDCREST LN   
EVERGREEN CT  Paved  DOGWOOD CT   
FAIRLAND ST   DUBOIS ST   
FLINT ROCK RD E   ELJAYS LN   
FROST POND RD   ERICKSON DR   
GLEASON AVE  Paved  ETHAN ALLEN LN   
GOLDEN FARM RD  Paved  FARA DR   
GREENWICH AVE (E)  Paved  FAWN DR   
HAPPY HILL RD  Paved  FLINT ROCK RD  
HAZELWOOD LN   FOURTH ST  Paved 
HIGH ROCK RD   FRANKEL PL   
HILLVIEW LN  Paved  GILFORD ST   
HOLLY COVE CIR   GOLF VIEW CIR   Paved 
HOME CT (CDS)   GURLEY RD   Paved 
HYDE ST   HARTFORD AVE   
INDIAN ROCK RD   HAVILAND DR   
IVY ST  Paved  HELEN PL   
JACKSON ST  Paved  IDLEWOOD PL   Paved 
KIRKHAM PL  Paved  INGALL ST   Paved 
KLONDIKE AVE   IRON GATE RD   
KNOLLWOOD AVE  Paved  JUDY LN   
LAWN AVE   KIJEK ST   
LIGHTHOUSE WAY  Paved  KNOBLOCH LN   
LIPTON PL  Paved  LANARK RD   Paved 
LONGVIEW AVE  Paved  LANCER LN   
LYNAM CT   LINDSEY AVE  
MAC GREGOR DR  Paved  LYNAM RD   
MARINERS LN  Paved  MAITLAND RD   
MATHEWS ST   MARIAN ST   
MEADOWPARK AVE E   MC CLEAN AVE   
MELROSE PL  Paved  MEADOWPARK AVE N   
MICHAEL RD   MEADOWPARK AVE W   
MOHAWK TRL  Paved  MITCHELL ST   Paved 
NOBILE ST  Paved  MOUNTAIN TRL   
OCEAN DR W  Paved  MOUNTAIN WOOD RD   
OLD BARN RD N   NATHAN HALE DR   
OLD BARN RD W   NICHOLS AVE   Paved 
PALMER ST   NOB HILL LN   
PAUL RD   NORTHWOOD LN   
PINE ST  Paved  OLD BARN RD S   
POND VIEW LN  Paved  OLD COLONY RD   Paved 
REED PL   OLGA DR   
REVONAH CIR S   OWEN ST   Paved 
RIDGE BROOK DR  Paved  PARAGON LN   Paved 
RIDGE BROOK LN  Paved  PARK ST   Paved 
RIVER RIDGE CT   PARKER AVE   
RIVERBANK DR   PEPPER RIDGE PL  
ROCK RIMMON LN  Paved  PHAIBAN LN   
ROSE PARK AVE  Paved  PINE HILL TER   
ROSE ST   RED BIRD RD   Paved 
SADDLE HILL LN  Paved  RELAY PL   Paved 
SADDLE HILL RD  Paved  RIDGE TREE LN   
SAGAMORE RD  Paved  RISING ROCK RD   
SANFORD LN   RIVER PL   
SHAGBARK RD  Paved  ROCKRIDGE LN   
SHELTER ROCK RD   SHADOW RIDGE RD   
SILVER ST  Paved  SILVER HILL LN   
SQUARE ACRE DR   SOUND AVE  Paved 
ST MARYS ST  Paved  SOUNDVIEW AVE   Paved 
STILLVIEW RD  Paved  SUMMIT RIDGE RD   
THORNWOOD RD  Paved  TAYLOR ST   Paved 
TYLER DR  Paved  THUNDER HILL DR   
WALNUT RIDGE LN  Paved  TOWER AVE   
WALTER LN  Paved  TRAILING ROCK LN   
WARDWELL ST  Paved  TREMONT AVE   
WHITE BIRCH LN   URBAN ST   
WILDER RD   VALLEY VIEW DR   
WIND MILL CIR   VAN BUSKIRK AVE   Paved 
WINDING BROOK LN   VAN RENSSELAER AVE   Paved 
WINESAP RD  Paved  WARCHOL LN   
WOODCLIFF ST  Paved  WARSHAW PL   Paved 
YALE CT  Paved  WARWICK LN   

 

Paving 2024-2025

1

Silver St

2

Burwood Ave

3

Beal St

4

Melrose Pl

5

Betts Ave

6

Warshaw Pl

7

Jackson St

8

Taylor St

9

Rose Park Ave

10

Nobile St

11

Depinedo Ave

12

Acosta St

13

Relay Pl

14

Pine St

15

Oak Hil St

16

Woodcliff St

17

Hubbard Ct

18

Ivy St

19

Vuono Dr

20

Golf View Circle

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer

2023 Road Paving Schedule

Road Name Scope Date Method
Robin Hood Rd Entire road Apr-23 Mill & Pave
Friar Tuck Ln Entire road Apr-23 Mill & Pave
Little John Ln Entire road Apr-23 Mill & Pave
Nottingham Dr Entire road Apr-23 Mill & Pave
Echo Hill Dr Entire road Apr-23 Reclaim & Pave
West View Ln Entire road May-23 Reclaim & Pave
Progress Dr Entire road May-23 Reclaim & Pave
Houston Terrace Entire road May-23 Mill & Pave
Avery St Entire road May-23 Mill & Pave
Dora St Entire road May-23 Mill & Pave
Dale St Entire road May-23 Mill & Pave
St. Benedict Circle Entire road May-23 Mill & Pave
William St Entire road May-23 Mill & Pave
Cove Rd Willowbrook to St. Benedict Circle May-23 Mill & Pave
Lee St Entire road Jun-23 Mill & Pave
Warren St Entire road Jun-23 Mill & Pave
Woodrow St. Entire road Jun-23 Mill & Pave
Fieldstone Ln Entire road Jun-23 Mill & Pave
Fieldstone Rd Entire road Jun-23 Mill & Pave
Fieldstone Circle Entire road Jun-23 Mill & Pave
Fieldstone Terrace Entire road Jun-23 Mill & Pave
Ralsey Rd Entire road Jun-23 Mill & Pave
Ralsey Rd S. Entire road Jun-23 Mill & Pave
Downs Ave Entire road Jun-23 Mill & Pave
Ralph St Entire road Jun-23 Mill & Pave
Whittaker St Entire road Jun-23 Mill & Pave
Stamford Ave Entire road Jun-23 Mill & Pave
Viaduct Rd Entire road Jun-23 Mill & Pave
Larkin St Entire road Jun-23 Mill & Pave
Poplar St Entire road Jun-23 Mill & Pave
Research Dr Entire road Jun-23 Mill & Pave
Cove Rd St. Benedict Circle to Elm Street Jul-23 Mill & Pave
W. Haviland Ln Entire road Aug-23 Reclaim & Pave
Bennington Ct Entire road Aug-23 Reclaim & Pave
Windward Lane Entire road Sep-23 Reclaim & Pave
Pond View Ln Entire road Sep-23 Reclaim & Pave
Golden Farm Rd Entire road Sep-23 Reclaim & Pave
Ridge Brook Dr Entire road Sep-23 Reclaim & Pave
Ridge Brook Lane Entire road Sep-23 Reclaim & Pave
Breezy Hill Rd Entire road Sep-23 Reclaim & Pave
Happy Hill Rd Entire road Sep-23 Reclaim & Pave
Mohawk Trail Entire road Oct-23 Reclaim & Pave
Shagbark Rd Entire road Oct-23 Reclaim & Pave
Tyler Dr Entire road Oct-23 Reclaim & Pave
Saddle Hill Rd Entire road Nov-23 Reclaim & Pave
Saddle Hill Ln Entire road Nov-23 Reclaim & Pave
Winesap Rd Entire road Nov-23 Reclaim & Pave
Crofts Ln Entire road Nov-23 Reclaim & Pave

2024 Road Paving Schedule

Road Name Scope Date Method
Nicholes Ave + extension Entire Road May-24 Reclaim & Pave
Hillview Lane Entire Road May-24 Reclaim & Pave
Yale Ct Entire Road May-24 Mill & Pave
Mercedes Lane Entire Road May-24 Mill & Pave
Knollwood Ave Entire Road May-24 Mill & Pave
Walnut Ridge Lane Entire Road May-24 Mill & Pave
Longview Ave Entire Road May-24 Mill & Pave
Clover Hill Dr Entire Road May-24 Mill & Pave
Evergreen Ct Entire Road May-24 Mill & Pave
Stillview Rd Entire Road May-24 Reclaim & Pave
Stanton Dr Entire Road May-24 Mill & Pave
River Ridge Ct Entire Road Jun-24 Mill & Pave
Three Lakes Dr Entire Road Jun-24 Mill & Pave
Sound Ave Entire Road - Utility Coordination Jul-24 Mill & Pave
Mitchell St Entire Road - Utility Coordination Jul-24 Mill & Pave
Mariners Ln Entire Road - Utility Coordination Jul-24 Mill & Pave
Gurley Rd Entire Road - Utility Coordination Jul-24 Mill & Pave
Chesterfield Rd Entire Road - Utility Coordination Jul-24 Mill & Pave
Seventh St Entire Road - Utility Coordination Jul-24 Mill & Pave
Weil St Entire Road - Utility Coordination Jul-24 Mill & Pave
Sachem Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Uncas Rd Entire Road - Utility Coordination Jul-24 Mill & Pave
Wascussee La Entire Road - Utility Coordination Jul-24 Mill & Pave
Willowbrook Ave Cove to Hale - Utility Coordination Jul-24 Mill & Pave
Hale St Entire Road - Utility Coordination Jul-24 Mill & Pave
Willowbrook Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Ferro Dr Hale to 26 Ferro Dr - Utility Coordination Jul-24 Mill & Pave
Kirkham Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Union St Entire Road - Utility Coordination Jul-24 Mill & Pave
Elm Tree Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Third St Bedford to Morgan - Utility Coordination Jul-24 Mill & Pave
Morgan St 3rd to 5th - Utility Coordination Jul-24 Mill & Pave
Fourth St Bedford to Revonah - Utility Coordination Jul-24 Mill & Pave
Urban St Entire Road - Utility Coordination Jul-24 Mill & Pave
Revonah Ave Revonah Circle to Chester - Utility Coord. Jul-24 Mill & Pave
Bridge St Washington to Summer - Utility Coord. Jul-24 Mill & Pave
Woodmere Rd Hubbard to Bridge - Utility Coord. Jul-24 Mill & Pave
Pellom Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Pell Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Lipton Pl Entire Road - Utility Coordination Jul-24 Mill & Pave
Atlantic Ave Henry to Lipton - Utility Coordination Jul-24 Mill & Pave
Eigth St Entire Road - Utility Coordination Aug-24 Mill & Pave
Waterford Lane Entire Road - Utility Coordination Aug-24 Mill & Pave
Wascussee Lane East Entire Road - Utility Coordination Aug-24 Mill & Pave
Paragon Ln Entire Road - Utility Coordination Aug-24 Mill & Pave
Red Bird Rd Entire Road - Utility Coordination Aug-24 Mill & Pave

Pepper Ridge Rd

2025 Road Paving Schedule

Road Name Scope Date Method
Wardwell St Entire Road 25-Apr Mill & Pave / Reclaim
Park St Entire Road 25-Apr Mill & Pave
Cummings Ave Entire Road 25-Apr Mill & Pave
Frederick St Entire Road 25-Apr Mill & Pave
Soundview Ave Entire Road 25-Apr Mill & Pave
Soundview Ct Entire Road 25-Apr Mill & Pave
Old Colony Rd Entire Road – Utility Coordination 25-Apr Mill & Pave
Bennette St Entire Road – Utility Coordination 25-Apr Mill & Pave
Van Buskirk Ave Entire Road 25-Apr Reclaim & Pave
Silver St Entire Road 25-Oct Mill & Pave
Burwood Ave Entire Road 25-Oct Mill & Pave
Beal St Entire Road 25-Oct Mill & Pave
Melrose Pl Entire Road 25-Oct Mill & Pave
Baxter Ave West Ave to 95 Entrance Ramp 25-Oct Mill & Pave
Betts Ave Entire Road 25-Oct Mill & Pave
Warshaw Pl Entire Road 25-Oct Mill & Pave
Jackson St Entire Road 25-Oct Mill & Pave
Taylor St Entire Road 25-Oct Mill & Pave
Rose Park Ave Entire Road 25-Oct Mill & Pave
Nobile St Entire Road 25-Oct Mill & Pave
Depinedo Ave Entire Road 25-Oct Mill & Pave
Acosta St Entire Road 25-Oct Mill & Pave
Relay Pl Entire Road 25-Oct Mill & Pave
Pine St Entire Road 25-Oct Mill & Pave
Oak Hill St Entire Road 25-Oct Mill & Pave
Woodcliff St Entire Road 25-Oct Mill & Pave
Hubbard Ct Entire Road 25-Oct Mill & Pave
Ivy St Entire Road 25-Oct Mill & Pave
Golf View Circle Entire Road 25-Oct Mill & Pave
Vuono Dr Entire Road 25-Oct Mill & Pave
Chatfield St Entire Road – Utility Coordination 25-Oct Mill & Pave
Edgewood Ave Entire Road – Utility Coordination 25-Oct Mill & Pave
Cleveland St Entire Road – Utility Coordination 25-Oct Mill & Pave
Hope St Chatfield to Edgewood – Utility Coordination 25-Oct Mill & Pave
Hope St Woodway to Weed Hill – Utility Coordination 25-Oct Mill & Pave
Bouton St W Intersection at Hope – Utility Coordination 25-Oct Mill & Pave
Minivale Rd Intersection at Hope – Utility Coordination 25-Oct Mill & Pave
Washington Ct Entire Road – Utility Coordination 25-Oct Mill & Pave
Renwick Pl Entire Road – Utility Coordination 25-Oct Mill & Pave
Vernon Pl Entire Road – Utility Coordination 25-Oct Mill & Pave
High St Entire Road – Utility Coordination 25-Oct Mill & Pave
Richmond Hill Ave Entire Road – Utility Coordination 25-Oct Mill & Pave
Taylor Reed Pl Entire Road – Utility Coordination 25-Oct Mill & Pave
Arthur Pl Entire Road – Utility Coordination 25-Oct Mill & Pave
Glenbrook Rd Intersection at Arthur – Utility Coordination 25-Oct Mill & Pave
Mill River St Smith St to W. Broad St – Utility Coord 25-Nov Mill & Pave
W. Main St Smith St to U.S. Rte 1 – Utility Coord 25-Nov Mill & Pave
Elm St 310 Elm St thru S. State St intersection – Utility Coord 25-Nov Mill & Pave
Glenbrook Rd Arlington to E. Main St – Utility Coord 25-Nov Mill & Pave
Strawberry Hill Ave 5th St to Colonial – Utility Coord 25-Nov Mill & Pave
Den Rd Merritt Pkwy to Bangall 25-Nov Reclaim & Pave
Bangall Rd Den Rd to 100 ft past Constance Ln 25-Nov Reclaim & Pave
Den Rd Roxbury to Merritt Pkwy 25-Nov Reclaim & Pave
Walter Ln Entire Road 25-Nov Reclaim & Pave
Claremont St Entire Road – Utility Coordination 25-Nov Mill & Pave
Congress St Entire Road – Utility Coordination 25-Nov Mill & Pave
Keith St Entire Road – Utility Coordination 25-Nov Mill & Pave
Noble St Entire Road – Utility Coordination 25-Nov Mill & Pave
Elmcroft Entire Road – Utility Coordination 25-Nov Mill & Pave
Pepper Ridge Rd Oaklawn to Silver Hill – Utility Coord 25-Nov Mill & Pave